Contact Us

Atten:Coco Wang

Tel:0086-18231737651

Fax:+86 0317 8188613

E-mail:formingmachine@rgcbe.com

Skype:coco.wang105

High-speed Guardrail Cold Roll Forming Machines/Expressway G

current location: 主页 > Product > no name >

time:2017-01-12 15:43 source:www.rgcbe.com

1.High Precision And Speed

2.CE,ISO certification

3.Customization Accept           

Suitable material

Color steel sheet , galvanized steel sheet

Main motor power

22KW with Cycloidal reducer  

Hydraulic station power

5.5KW

Hydraulic oil

36#40# abrade oil

Thickness of material

3mm~4mm

Electric tension

380V 3phase 50HZ 

Material of roller

GCR15 Bearing Steel quenched HRC58-62, hard chrome coated 0.05mm

Processing speed 

12-16m/min

Processing precision 

within 1.00mm

Material of cutting blade 

Cr12 Mov

Transmission

Sprocket&Chain(1.5 inch)

Roller station  

13 Rollers

Product Show

Flow Chart

 

Application

Packing and Delivery

FAQ

Q1. What's your delivery time?
A1:Depending on the type of machine, duration of 1.25 days to 60 days from the date of order.

Q2. Do you have after-sales support?
A2:Yes, we are happy to give advice and we also have skilled technicians available across the world.We need your machines running in order to keep your business running.


Q3. Do you sell only standard machines?
A3:No, most of our machines are built according to customers specifications,using top brand components.

Q4. What will you do if the machine is broken?
A4:Our machine's warranty period is 12months,if the broken parts can't repair,we can send the new parts replace the broken parts freely,but you need pay the express cost yourself.If it is beyond the warranty period,we can negotiate to solve the problem,and we supply the technical support for the whole life of the equipment.


Q5. Can you be responsible for transport?
A5:Yes,please tell me the destination port or address.we have rich experience in transporting.

 

Q6. How to visit your company?
A6: 1) Fly to Beijing airport, By high speed train From Beijing Nan to Cangzhou Xi (1 hour).
      2) Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.

Email:formingmachine@rgcbe.com
Tel/Whatsapp:+86 18231737651
Skype:coco.wang105

上一篇:color steel gutter rainspout roll forming line
下一篇:没有了


Name:




E-mail:




Message:


 

On-line On-line